| Record No. | Application Date | Type | Street Address | Description | Permit Status | Current Status |
| ZP-26-134 | 4/2/2026 | Zoning Permit | 1 King Street | Install prefab pavilion with retractable awning | Open | Z Card Posting |
| ZP-26-133 | 4/2/2026 | Zoning Permit | 275-277 Flynn Avenue | Subdividing property | Open | Z Card Posting |
| ZPS-26-11 | 4/2/2026 | Zoning Permit - Signs | 60 Davis Road | This permit is for signage on the Virtue Field Support Building (ZP-25-256). The signage includes:North Elevation - Halo Lit V Cat Logo and "Pizzagalli Support Building" letters. 36" x 36.9".Logo made from fabricated aluminum, 2" deep. Face of logo made from 1/4" thick aluminum with 7 colors, masked and painted. "Pizzagalli Support Building" three dimensional lettering made from 3/8" thick aluminum, brushed finish on 1/4" spacers. V Cat Logo to be backlit. LED Lit package. 10 bright white LEDs. UL or UR certified labels, documents, and required class 2 power supplies with interior/exterior rated enclosure. WET location rated. UL Certified power supplies.East Elevation - 1) "Hilton Family Plaza" three dimensional lettering made from 3/8" aluminum, vertical-brushed finish, 5" tall and "John Hilton UVM Class of '68" three dimenisional lettering made from 3/8" aluminum, vertical-brushed finish, 4" tall. 2) 16" x 20.3" plaque made from precision tooled aluminum.West Elevation - Two 8" x 10.3" plaques. Both made from precision tooled aluminum | Open | Z Card Posting |
| ZP-26-132 | 4/2/2026 | Zoning Permit | 72-76 Elmwood Avenue | This application proposes the removal of the existing church foundation at 72–76 Elmwood Avenue. The area will be regraded and surfaced with gravel to accommodate its use as a designated parking area. A portion of the existing foundation will be retained in place to clearly define the limits of the parking area and to prevent inadvertent encroachment into the adjacent greenspace. | Open | Z Card Posting |
| ZP-26-131 | 4/2/2026 | Zoning Permit | 84 Centennial Woods Way | Install 170' of pipe and wire from designated panel alredy existing. The purpose is to run a State funding air monitoring system. System requirements: -For siting requirements, federal regulation requires at least 10 meters from trees, 10 meters from the road, and at least 270 degrees of unobstructed airflow. – Physical description- 8 feet by 16 feet, and 8 feet tall (plus ~3 feet tall handrails and 10-meter meteorological tower). It weighs around 2,400 lbs. | Open | Z Card Posting |
| ZPS-26-10 | 4/1/2026 | Zoning Permit - Signs | 1127 North Avenue | refacing existing sigh | Open | Z Card Posting |
| ZP-26-130 | 4/1/2026 | Zoning Permit | 37 Intervale Avenue | Replaced a window in a shower and retiled the surround. | Open | Z Card Posting |
| ZPD-26-3 | 3/31/2026 | Zoning Permit - Deck | 1048-1054 North Avenue | Remove back stairs and bring all porch rails to 42' | Open | Z Card Posting |
| ZPW-26-44 | 3/31/2026 | Zoning Permit - Windows | 79 Lafountain Street | Replace one window with larger casement window and remove and side over another window | Open | Z Card Posting |
| ZP-26-129 | 3/31/2026 | Zoning Permit | 145 Austin Drive | Add a carport on the rear of the house | Open | Z Card Posting |
| ZPF-26-9 | 3/31/2026 | Zoning Permit - Fence | 99 Intervale Road | As part of Intervale Road Path project, add decorative fence to accommodate the City's new shared use path | Open | Z Card Posting |
| ZP-26-128 | 3/31/2026 | Zoning Permit | 99 Intervale Road | As part of the Intervale Rd Path project, relocate one of the soil storage bays on the 99 Intervale parcel to accommodate the City's new shared use path | Open | Z Card Posting |
| ZP-26-127 | 3/31/2026 | Zoning Permit | 128 Intervale Road | Drainage swale and pipe to improve drainage as part of the Intervale Road Path project (City's new shared use path) | Open | Z Card Posting |
| ZP-26-126 | 3/31/2026 | Zoning Permit | 35 Intervale Road | Build new retaining wall to accommodate City's new shared use path | Open | Z Card Posting |
| ZP-26-125 | 3/31/2026 | Zoning Permit | 29 Intervale Road | Build retaining wall to accommodate City's new shared use path | Open | Z Card Posting |
| ZPF-26-8 | 3/31/2026 | Zoning Permit - Fence | 525 Riverside Avenue | Relocate Fence | Open | Z Card Posting |
| ZP-26-124 | 3/30/2026 | Zoning Permit | 55-57 North Willard Street | Installation of parking barrier alongside the driveway. | Open | Z Card Posting |
| ZP-26-123 | 3/30/2026 | Zoning Permit | 17 Washington Street | Proposed installation of sauna cabin in backyard. | Open | Application Assessment |
| ZP-26-122 | 3/30/2026 | Zoning Permit | 118 Dale Road | Proposed establishment of a spa home occupation. | Open | Application Assessment |
| ZPF-26-7 | 3/29/2026 | Zoning Permit - Fence | 37 Stanbury Road | Proposed replacement of existing four-foot-tall picket fence with a six-foot-tall privacy fence. | Closed | Complete |
| ZP-26-121 | 3/29/2026 | Zoning Permit | 37 Stanbury Road | Proposed replacement of existing four-foot-tall picket fence with a six-foot-tall privacy fence. Proposal includes replacing an existing 8' x 9' shed with a 10' x 12' shed. | Open | Application Assessment |
| ZP-26-120 | 3/27/2026 | Zoning Permit | 1885 North Avenue | Proposed demolition of all existing structures and hardscaped surfaces on lot, with the exception of existing privacy fencing. Proposal for demolition only. | Open | Project Manager Assignment |
| ZPW-26-43 | 3/27/2026 | Zoning Permit - Windows | 43-45 Manhattan Drive | Proposed replacement of one existing wooden double-hung window unit with an aluminum unit. | Open | Project Manager Assignment |
| ZP-26-119 | 3/26/2026 | Zoning Permit | 19 Catherine Street | Proposed removal of pavers in front of house to construct a covered front porch. Proposal includes replacing existing porches and re-siding house. | Open | Application Assessment |
| ZP-26-118 | 3/26/2026 | Zoning Permit | 89 North Prospect Street | Proposed removal of 65 sq. ft. of existing walkway, constructed of concrete and pavers, to replace with 155 sq. ft. of concrete walkway to match existing walkways. Remove 65 square-feet of existing walkway (a two-foot-wide segment of concrete and pavers) and replace with 155 square-foot (4-foot-wide) concrete walkway to match other existing concrete walkways. | Open | Application Assessment |
| ZPR-26-5 | 3/26/2026 | Zoning Permit - Roofing/Siding | 17 Deforest Heights | Remove and replace roof shingles. Remove copper snow belt and valley flashings and replace with 24 gauge metal. | Closed | Zoning Permit Non-Applicable |
| ZP-26-117 | 3/26/2026 | Zoning Permit | 1162 North Avenue 2 | Proposed expansion of existing landing and stairs to meet code requirements. | Open | Application Assessment |
| ZP-26-116 | 3/26/2026 | Zoning Permit | 280 Colchester Avenue | Proposed replacement of existing gravel driveway and concrete walkway with pavers. Change in materials only, no change in footprint/lot coverage. | Open | Application Assessment |
| ZP-26-115 | 3/26/2026 | Zoning Permit | 239 South Union Street | Proposed conversion of existing office into a two-bedroom apartment. | Open | Application Assessment |
| ZPW-26-42 | 3/26/2026 | Zoning Permit - Windows | 115 Caroline Street | This project involves the restoration and weatherization of existing windows and doors. A total of 18 original four-pane wood windows and one basement window will be repaired and restored in place, including replacement of broken glass, repair of sash components, rebalancing with new or repaired weights, and restoration of hardware such as locks. All work will preserve the original size, configuration, and appearance of the windows.In addition, two existing exterior doors will be weatherized through the installation of interior storm panes to improve energy efficiency while maintaining the original exterior appearance.All work is limited to repair and restoration; no changes to existing window configuration or door openings are proposed. | Closed | Zoning Permit Non-Applicable |
| ZPW-26-41 | 3/26/2026 | Zoning Permit - Windows | 261 South Winooski Avenue | (After-the-Fact) Replacement of old and damaged windows. | Open | Application Assessment |
| ZP-26-114 | 3/25/2026 | Zoning Permit | 32 Grove Street | Proposed replacement of siding and windows damaged in fire. | Open | Application Assessment |
| ZP-26-113 | 3/25/2026 | Zoning Permit | 119 Spruce Street | (After-the-Fact) Permitting for exterior building changes. Rearrange laundry room, bathroom, storage closets and utility room in basement. Reframe rotted wood due to flood from January 2024. Insulate, drywall, trim and formally finish space for living. Basement was previously utilized for living space but walls were stone and ceiling was NOT insulated or drywall. Change basement windows: No change in window width; Window height is extended by 1' or 2'; Window location is the same on three sides; Window location will change on bottom by 1' or 2'; Window; Window wells will be installed only if necessary; Six of the windows will be 3x3 feet and two windows will be 4x4 feet. Window changes will NOT be seen from the street as the two front basement windows will be covered by a porch and shrubs. | Open | Application Assessment |
| ZPR-26-4 | 3/25/2026 | Zoning Permit - Roofing/Siding | 377 Pine Street | Proposed replacement of existing deteriorated metal roof with a new membrane roof. | Open | Project Manager Assignment |
| ZPF-26-6 | 3/25/2026 | Zoning Permit - Fence | 30 Spring Street | Proposed replacement of existing deteriorated stockade fence with a dog-ear fence. | Open | Project Manager Assignment |
| ZP-26-112 | 3/24/2026 | Zoning Permit | 95 Pine Street | Proposed reconfiguration of west side of parking lot. | Open | Application Assessment |
| ZPF-26-5 | 3/24/2026 | Zoning Permit - Fence | 156 Woodbury Road | Proposed replacement of existing four-foot-tall picket fencing with six-foot-tall privacy fencing. | Open | Project Manager Assignment |
| ZPW-26-40 | 3/23/2026 | Zoning Permit - Windows | 32 Birch Court | REMOVE AND REPLACE 2 WINDOWS. LIKE SIZES AND NO STRUCTURAL CHANGES. | Closed | Zoning Permit Non-Applicable |
| ZP-26-111 | 3/23/2026 | Zoning Permit | 40 Crowley Street | Proposed removal and replacement of existing wooden trim with Boral composite material. Proposal includes facade repair/replacements in kind. Repair of all in-need areas of the exterior of the house to ready it for a full exterior repaint.Includes: Removal and replacement of all failed trim on house with Boral composite materialMinor siding replacement where needed with primed hemlock sidingSmall areas of epoxy repair where it provides exceptional value to client | Open | Administrative Decision |
| ZPS-26-9 | 3/20/2026 | Zoning Permit - Signs | 266 Queen City Park Road | (After-the-Fact) Installation of four freestanding signs and one wall sign. | Open | Application Assessment |
| ZP-26-110 | 3/20/2026 | Zoning Permit | 985 North Avenue | (After-the-Fact) Change of current streetlight heads. | Open | Zoning Permit Application Fee |
| ZP-26-109 | 3/19/2026 | Zoning Permit | 184 Church Street | Proposed change of use from apartment building to 24-bed community house. | Open | Administrative Appeal Period |
| ZP-26-108 | 3/19/2026 | Zoning Permit | 73 Caroline Street | Proposed demolition and replacement of existing chimney. A chimney services company inspected the chimney on my house on 3/19/26 and determined that because of its poor condition, it could not be repaired and needed to be demolished and replaced | Closed | Zoning Permit Non-Applicable |
| ZP-26-107 | 3/19/2026 | Zoning Permit | 36 Strong Street | Proposed installation of open-air landscape amenities including a 128 sq. ft. patio and 163 sq. ft. walkway constructed of bluestone and flagstone pavers. After-the-fact shed installation too. | Open | Administrative Appeal Period |
| ZPR-26-3 | 3/18/2026 | Zoning Permit - Roofing/Siding | 106 Locust Street | (After-the-Fact) Submittal for roofing change from asphalt shingles to galvalume standing seam metal. | Open | Administrative Decision |
| ZP-26-106 | 3/18/2026 | Zoning Permit | 50 Howard Street | Proposed change of use from duplex to four-unit structure. No site or exterior building changes. | Open | Administrative Appeal Period |
| ZP-26-105 | 3/18/2026 | Zoning Permit | 757 South Prospect Street | Proposed exterior renovations including new siding, two new windows, new wooden doors and garage door on front of house, and reduced porch sizes. | Open | Application Assessment |
| ZP-26-104 | 3/18/2026 | Zoning Permit | 30 Avenue C | Proposed removal of existing manufactured home, demolition only. | Closed | Complete |
| ZP-26-103 | 3/18/2026 | Zoning Permit | 0-64 Southwind Drive | Proposed retrofit of existing stormwater treatment pond into a gravel wetland for Oakbeach Dr. subdivision for improved stormwater treatment. This is a stormwater improvement project for the Oak Beach Drive subdivision off of Flynn Ave in Burlington, VT. This project proposes a retrofit of the existing stormwater treatment pond into a gravel wetland for improved stormwater treatment. The gravel wetland will have a similar footprint to the existing pond. | Open | Zoning Permit Application Fee |
| ZPW-26-39 | 3/18/2026 | Zoning Permit - Windows | 308 South Winooski Avenue 3 | Proposed replacement of 12 windows. | Open | Project Manager Assignment |