Street Status Project Type Project Name
Completed Burlington Electric Department Cherry St - Underground cable replacement
Completed Burlington Electric Department Church St - Underground Cable Replacement
Completed Burlington Electric Department GMP Line Conversion
Completed Burlington Electric Department Rebuild 1L1 Circuit
Completed Burlington Electric Department Rebuild 3L4 Line
Proposed DPW Curb Replacement Curb Reconstruction (DPW)
Completed DPW Curb Replacement Curb Reconstruction (DPW)
Completed DPW Curb Replacement Curb Replacement (ROW)
Completed DPW Curb Replacement ROW Curb - Sidewalk
Completed DPW Engineering Hyde St (School)- Patch
Completed DPW Engineering VTrans 2023 Paving: N Winooski Ave.
Proposed DPW Paving Allen St - Paving
Proposed DPW Paving Allen St - Paving
Proposed DPW Paving Chase St - Patch Paving
Proposed DPW Paving CY21 Street Paving
Completed DPW Paving CY22 Birchcliff Parkway - Paving
Completed DPW Paving CY22 Paving: Birchcliff Parkway
Completed DPW Paving CY23 Patching: North Ave.
Completed DPW Paving CY23 Proposed Patching
Completed DPW Paving CY23 Proposed Patching
Completed DPW Paving CY23 Proposed Patching
Proposed DPW Paving CY23 Proposed Patching: Cottage Grove/Grey Meadow
Completed DPW Paving CY23 Proposed Patching: Ferguson
Completed DPW Paving CY23 Proposed Patching: Rivermount Terrace
Completed DPW Paving CY23 Proposed Patching: Saratoga Ave.
Completed DPW Paving CY23 Proposed Patching: Staniford
Proposed DPW Paving CY23 Proposed Patching: Woodbury
Proposed DPW Paving CY24 Paving: North Ave.
DPW Paving Deforest Rd - Paving
Completed DPW Paving Ferguson Ave. Patching
Completed DPW Paving Franklin Sq - Paving
Completed DPW Paving Franklin Sq- Paving
Completed DPW Paving Hyde St - Patch
Completed DPW Paving Hyde St - Patch
Completed DPW Paving Lakeview Cemetery Paving
Completed DPW Paving Lakeview Cemetery Paving
Completed DPW Paving North Ave (33 N AVE to Cambrian Rise) - Paving
Completed DPW Paving North Ave (Sherman to 33 N AVE) - Paving
Completed DPW Paving Pearl St - Patch Paving
Completed DPW Paving Pine St - Patch
Proposed DPW Paving Plattsburg Ave - Paving
Proposed DPW Paving Route 127- Patch
Completed DPW Paving S Prospect - Patch
Completed DPW Paving S Prospect - Patch
Completed DPW Paving S Prospect - Patch
Completed DPW Paving Shelburne Rd at Home Ave - Patch Paving
Completed DPW Sidewalks
Completed DPW Sidewalks
Proposed DPW Sidewalks
Proposed DPW Sidewalks
Proposed DPW Sidewalks
Proposed DPW Sidewalks
Proposed DPW Sidewalks
Proposed DPW Sidewalks
Proposed DPW Sidewalks
Completed DPW Sidewalks
Completed DPW Sidewalks
Completed DPW Sidewalks
Completed DPW Sidewalks
Completed DPW Sidewalks
Completed DPW Sidewalks
Completed DPW Sidewalks
Completed DPW Sidewalks
Completed DPW Sidewalks
Completed DPW Sidewalks
Completed DPW Sidewalks
Completed DPW Sidewalks
Completed DPW Sidewalks
Completed DPW Sidewalks
Proposed DPW Sidewalks
Proposed DPW Sidewalks
Proposed DPW Sidewalks
Proposed DPW Sidewalks
Proposed DPW Sidewalks
Proposed DPW Sidewalks
Completed DPW Sidewalks
Completed DPW Sidewalks
Completed DPW Sidewalks
Completed DPW Sidewalks
Completed DPW Sidewalks
Completed DPW Sidewalks
Proposed DPW Sidewalks
Proposed DPW Sidewalks
Proposed DPW Sidewalks
Proposed DPW Sidewalks
Proposed DPW Sidewalks
Completed DPW Sidewalks Sidewalk Replacement
Completed DPW Transportation Elmwood Ave / Grant St intersection improvement
Completed DPW Transportation Old North End Greenway
Completed DPW Transportation Pearl / Battery St intersection improvement
Completed DPW Transportation Pearl / George intersection improvement
Completed DPW Transportation Willard St Shared Lane Markings
Completed DPW Water Resources BHS and North Beach - Water Relining
Completed DPW Water Resources Bradley St. GW Discharge
Postponed DPW Water Resources Cliff St Water Main Consolidation
Completed DPW Water Resources College St Force Main Lining
Completed DPW Water Resources East Plant Phase 1 Upgrades
Completed DPW Water Resources Main Plant Upgrade Phase 1
Postponed DPW Water Resources St Paul Street Water Main Replacement
Completed DPW Water Resources System 15P
????? DPW Water Resources University Place - Water Line Consolidation
Proposed DPW Water Resources Upper N. Beach Pump Station Improvements
Proposed DPW Water Resources Water Plant Pump Station Improvements
Completed DPW Water Resources WWTP Upgrades Phase 1
Completed Parks, Recreation & Waterfront Baird Park BBall Court Resurfacing
Completed Parks, Recreation & Waterfront Burlington Greenway - Railway Realignment.
Completed Parks, Recreation & Waterfront Burlington Greenway Rehabilitation - Phase 3b
Completed Parks, Recreation & Waterfront Burlington Greenway Rehabilitation Phase 3a
Completed Parks, Recreation & Waterfront Calahan Park Playground Replacement
Under Construction Parks, Recreation & Waterfront Champlain St. Park Renovations
Proposed Parks, Recreation & Waterfront Inclusion and Belonging Sculpture
Under Construction Parks, Recreation & Waterfront Leddy Park Pause Place and BioSwale
Postponed Parks, Recreation & Waterfront North Beach Campground Pull-Through Sites and Road
Completed Parks, Recreation & Waterfront North Shore Pause Place
Approved/In-Design Parks, Recreation & Waterfront Pomeroy Park Tot-Lot Replacement
Approved/In-Design Parks, Recreation & Waterfront Schifilliti Park Multi-Use Pathway
Under Construction Private Developer City Place Burlington
Proposed Private Developer Private Development: 157 South Champlain Street
977 North Ave Approved/In Design DPW Water Resources CWSRF Pipe Rehabilitation Project (RF1-187)
977 North Ave Approved/In Design DPW Water Resources CWSRF Pipe Rehabilitation Project (RF1-187)
977 North Ave Approved/In Design DPW Water Resources CWSRF Pipe Rehabilitation Project (RF1-187)
ADAMS CT & EXT Proposed DPW Sidewalks Sidewalk replacement at 25 ADAMS CT & EXT
ADAMS ST Completed DPW Paving Adams St Crack Sealing
ADAMS ST Proposed DPW Sidewalks Sidewalk replacement at 35 ADAMS ST
ADSIT CT Completed DPW Sidewalks Willard - End
ADSIT CT Completed DPW Sidewalks Willard - End
ALEXIS DRIVE Completed DPW Paving Alexis Dr Crack Sealing
ALEXIS DRIVE Completed DPW Water Resources Alexis Drive - Stormwater Treatment Facility
ALFRED STREET Completed DPW Paving Alfred St Crack Sealing
ALFRED STREET Completed DPW Sidewalks Sidewalk reconstruction project at 200 Shelburne on ALFRED STREET
ALFRED STREET Proposed DPW Sidewalks Sidewalk reconstruction project at 210 Shelburne on ALFRED STREET
ALGIRD ST Completed DPW Paving Algird
ALGIRD ST Completed DPW Paving Algird St Crack Sealing
ALLEN ST Proposed DPW Sidewalks
ALLEN ST Completed DPW Water Resources Allen St - Water Main Relining
ALLEN ST Completed DPW Water Resources Allen St Stormwater Infiltration System
APPLETREE PT RD Under Construction Burlington Electric Department Appletree Point 13.8kV Conversion
APPLETREE PT RD Proposed DPW Sidewalks
ARCHIBALD ST Completed DPW Paving Archibald St Crack Sealing
ARCHIBALD ST Completed DPW Paving Archibald St Paving
ARCHIBALD ST Proposed DPW Sidewalks
ARCHIBALD ST Completed DPW Sidewalks Sidewalk reconstruction project at 248 N Willard on ARCHIBALD ST
ARCHIBALD ST Completed DPW Sidewalks Sidewalk Replacement
ARCHIBALD ST Completed DPW Sidewalks Sidewalk Replacement
ARCHIBALD ST Approved/In-Design DPW Transportation Quick-Build Intersection Improvements Archibald/In
ARCHIBALD ST Approved/In-Design DPW Water Resources CWSRF Pipe Rehabilitation Project (RF1-187)
ARCHIBALD ST Approved/In-Design DPW Water Resources CWSRF Pipe Rehabilitation Project (RF1-187)
AUSTIN DR DPW Paving Austin (Home to Red Rocks)
AUSTIN DR Completed DPW Paving Austin (Red Rocks to End) Paving
AUSTIN DR Completed DPW Sidewalks Sidewalk reconstruction project at 1 Industrial on AUSTIN DR
AUSTIN DR Completed DPW Sidewalks Sidewalk reconstruction project at 121-91 AUSTIN DR
AUSTIN DR Completed DPW Sidewalks Sidewalk reconstruction project at 181-165 AUSTIN DR
AUSTIN DR Completed DPW Sidewalks Sidewalk reconstruction project at 197 AUSTIN DR
AUSTIN DR Completed DPW Sidewalks Sidewalk reconstruction project at 219 AUSTIN DR
AUSTIN DR Completed DPW Sidewalks Sidewalk reconstruction project at 243 AUSTIN DR
AUSTIN DR Completed DPW Sidewalks Sidewalk reconstruction project at 309 AUSTIN DR
AUSTIN DR Completed DPW Sidewalks Sidewalk reconstruction project at 91 AUSTIN DR
AUSTIN DR Completed DPW Transportation Austin Dr Bike Lanes
AUSTIN DR Completed DPW Water Resources Austin Dr - Water Main Rehabilitation
AUSTIN DR Completed DPW Water Resources Cured In Place Pipe Relining FY 19
AUSTIN DR Completed DPW Water Resources CWSRF Pipe Rehabilitation Project (RF1-187)
AUSTIN DR Completed DPW Water Resources CWSRF Pipe Rehabilitation Project (RF1-187)
AUSTIN DR Accepted DPW Water Resources CWSRF Pipe Rehabilitation Project (RF1-187)
BANK ST Completed DPW Sidewalks Sidewalk reconstruction project at 100 BANK ST
BANK ST Completed DPW Sidewalks Sidewalk Replacement
BANK ST Approved/In-Design DPW Water Resources CWSRF Pipe Rehabilitation Project (RF1-187)
BANK ST Approved/In-Design DPW Water Resources CWSRF Pipe Rehabilitation Project (RF1-187)
BANK ST Canceled Private Developer Burlington Town Center
BARLEY RD Completed DPW Paving Barley Rd Crack Sealing
BARLEY RD Proposed DPW Sidewalks
BARRETT ST Completed DPW Sidewalks Sidewalk reconstruction project at 485 BARRETT ST
BARRETT ST Completed DPW Sidewalks Sidewalk reconstruction project at 50 BARRETT ST
BARRETT ST Approved/In-Design DPW Water Resources CWSRF Pipe Rehabilitation Project (RF1-187)
BARRETT ST Approved/In-Design DPW Water Resources CWSRF Pipe Rehabilitation Project (RF1-187)
BARRETT ST Approved/In-Design DPW Water Resources CWSRF Pipe Rehabilitation Project (RF1-187)
BARRETT ST Approved/In-Design DPW Water Resources CWSRF Pipe Rehabilitation Project (RF1-187)
BATCHEDLER ST Completed DPW Water Resources Batchelder St - Water Main Replacement
BATCHEDLER ST Completed DPW Water Resources Batchelder Street - Sewer Rehabilitation
BATTERY ST Approved/In-Design Burlington Electric Department Battery & Pearl Switchgear Replacement
BATTERY ST Completed DPW Paving Battery St Crack Sealing
BATTERY ST Proposed DPW Sidewalks
BATTERY ST Completed DPW Traffic Battery & Maple Pedestrian Signals
BATTERY ST Completed DPW Water Resources Battery Street - Combined Sewer Rehabilitation
BATTERY ST Approved/In-Design DPW Water Resources CWSRF Pipe Rehabilitation Project (RF1-187)
BAYVIEW ST Completed DPW Sidewalks
BAYVIEW ST Completed DPW Sidewalks
BEACHCREST DR Proposed DPW Sidewalks Sidewalk reconstruction project at 231 Lakewood on BEACHCREST DR
BEACHCREST DR Completed DPW Water Resources CWSRF Pipe Rehabilitation Project (RF1-187)
BEACHCREST DR Approved/In Design DPW Water Resources CWSRF Pipe Rehabilitation Project (RF1-187)
BEACHCREST DR Completed DPW Water Resources CWSRF Pipe Rehabilitation Project (RF1-187)
BEECH ST Completed DPW Paving Beech St Crack Sealing
BELTLINE - 127 Under Construction Burlington Electric Department 1L4 Long Spans
BELTLINE - 127 Completed DPW Paving Beltline 127 Crack Sealing
BELTLINE - 127 Completed DPW Paving Beltline Paving
BELTLINE - 127 Completed DPW Paving Beltline Ramps North Ave
BELTLINE - 127 Approved/In Design DPW Water Resources CWSRF Pipe Rehabilitation Project (RF1-187)
BELTLINE - 127 Under Construction DPW Water Resources CWSRF Pipe Rehabilitation Project (RF1-187)
BELTLINE - 127 Approved/In Design DPW Water Resources CWSRF Pipe Rehabilitation Project (RF1-187)
BELTLINE - 127 Approved/In Design DPW Water Resources CWSRF Pipe Rehabilitation Project (RF1-187)
BELTLINE - 127 Completed DPW Water Resources Rt. 127 Stormwater Outfall Repair
12345678