Street
|
Status
|
Project Type
|
Project Name
|
|
Completed
|
Burlington Electric Department
|
Cherry St - Underground cable replacement
|
|
Completed
|
Burlington Electric Department
|
Church St - Underground Cable Replacement
|
|
Completed
|
Burlington Electric Department
|
GMP Line Conversion
|
|
Completed
|
Burlington Electric Department
|
Rebuild 1L1 Circuit
|
|
Completed
|
Burlington Electric Department
|
Rebuild 3L4 Line
|
|
Proposed
|
DPW Curb Replacement
|
Curb Reconstruction (DPW)
|
|
Completed
|
DPW Curb Replacement
|
Curb Reconstruction (DPW)
|
|
Completed
|
DPW Curb Replacement
|
Curb Replacement (ROW)
|
|
Completed
|
DPW Curb Replacement
|
ROW Curb - Sidewalk
|
|
Completed
|
DPW Engineering
|
Hyde St (School)- Patch
|
|
Completed
|
DPW Engineering
|
VTrans 2023 Paving: N Winooski Ave.
|
|
Proposed
|
DPW Paving
|
Allen St - Paving
|
|
Proposed
|
DPW Paving
|
Allen St - Paving
|
|
Proposed
|
DPW Paving
|
Chase St - Patch Paving
|
|
Proposed
|
DPW Paving
|
CY21 Street Paving
|
|
Completed
|
DPW Paving
|
CY22 Birchcliff Parkway - Paving
|
|
Completed
|
DPW Paving
|
CY22 Paving: Birchcliff Parkway
|
|
Completed
|
DPW Paving
|
CY23 Patching: North Ave.
|
|
Completed
|
DPW Paving
|
CY23 Proposed Patching
|
|
Completed
|
DPW Paving
|
CY23 Proposed Patching
|
|
Completed
|
DPW Paving
|
CY23 Proposed Patching
|
|
Proposed
|
DPW Paving
|
CY23 Proposed Patching: Cottage Grove/Grey Meadow
|
|
Completed
|
DPW Paving
|
CY23 Proposed Patching: Ferguson
|
|
Completed
|
DPW Paving
|
CY23 Proposed Patching: Rivermount Terrace
|
|
Completed
|
DPW Paving
|
CY23 Proposed Patching: Saratoga Ave.
|
|
Completed
|
DPW Paving
|
CY23 Proposed Patching: Staniford
|
|
Proposed
|
DPW Paving
|
CY23 Proposed Patching: Woodbury
|
|
Proposed
|
DPW Paving
|
CY24 Paving: North Ave.
|
|
|
DPW Paving
|
Deforest Rd - Paving
|
|
Completed
|
DPW Paving
|
Ferguson Ave. Patching
|
|
Completed
|
DPW Paving
|
Franklin Sq - Paving
|
|
Completed
|
DPW Paving
|
Franklin Sq- Paving
|
|
Completed
|
DPW Paving
|
Hyde St - Patch
|
|
Completed
|
DPW Paving
|
Hyde St - Patch
|
|
Completed
|
DPW Paving
|
Lakeview Cemetery Paving
|
|
Completed
|
DPW Paving
|
Lakeview Cemetery Paving
|
|
Completed
|
DPW Paving
|
North Ave (33 N AVE to Cambrian Rise) - Paving
|
|
Completed
|
DPW Paving
|
North Ave (Sherman to 33 N AVE) - Paving
|
|
Completed
|
DPW Paving
|
Pearl St - Patch Paving
|
|
Completed
|
DPW Paving
|
Pine St - Patch
|
|
Proposed
|
DPW Paving
|
Plattsburg Ave - Paving
|
|
Proposed
|
DPW Paving
|
Route 127- Patch
|
|
Completed
|
DPW Paving
|
S Prospect - Patch
|
|
Completed
|
DPW Paving
|
S Prospect - Patch
|
|
Completed
|
DPW Paving
|
S Prospect - Patch
|
|
Completed
|
DPW Paving
|
Shelburne Rd at Home Ave - Patch Paving
|
|
Completed
|
DPW Sidewalks
|
|
|
Completed
|
DPW Sidewalks
|
|
|
Proposed
|
DPW Sidewalks
|
|
|
Proposed
|
DPW Sidewalks
|
|
|
Proposed
|
DPW Sidewalks
|
|
|
Proposed
|
DPW Sidewalks
|
|
|
Proposed
|
DPW Sidewalks
|
|
|
Proposed
|
DPW Sidewalks
|
|
|
Proposed
|
DPW Sidewalks
|
|
|
Completed
|
DPW Sidewalks
|
|
|
Completed
|
DPW Sidewalks
|
|
|
Completed
|
DPW Sidewalks
|
|
|
Completed
|
DPW Sidewalks
|
|
|
Completed
|
DPW Sidewalks
|
|
|
Completed
|
DPW Sidewalks
|
|
|
Completed
|
DPW Sidewalks
|
|
|
Completed
|
DPW Sidewalks
|
|
|
Completed
|
DPW Sidewalks
|
|
|
Completed
|
DPW Sidewalks
|
|
|
Completed
|
DPW Sidewalks
|
|
|
Completed
|
DPW Sidewalks
|
|
|
Completed
|
DPW Sidewalks
|
|
|
Completed
|
DPW Sidewalks
|
|
|
Proposed
|
DPW Sidewalks
|
|
|
Proposed
|
DPW Sidewalks
|
|
|
Proposed
|
DPW Sidewalks
|
|
|
Proposed
|
DPW Sidewalks
|
|
|
Proposed
|
DPW Sidewalks
|
|
|
Proposed
|
DPW Sidewalks
|
|
|
Completed
|
DPW Sidewalks
|
|
|
Completed
|
DPW Sidewalks
|
|
|
Completed
|
DPW Sidewalks
|
|
|
Completed
|
DPW Sidewalks
|
|
|
Completed
|
DPW Sidewalks
|
|
|
Completed
|
DPW Sidewalks
|
|
|
Proposed
|
DPW Sidewalks
|
|
|
Proposed
|
DPW Sidewalks
|
|
|
Proposed
|
DPW Sidewalks
|
|
|
Proposed
|
DPW Sidewalks
|
|
|
Proposed
|
DPW Sidewalks
|
|
|
Completed
|
DPW Sidewalks
|
Sidewalk Replacement
|
|
Completed
|
DPW Transportation
|
Elmwood Ave / Grant St intersection improvement
|
|
Completed
|
DPW Transportation
|
Old North End Greenway
|
|
Completed
|
DPW Transportation
|
Pearl / Battery St intersection improvement
|
|
Completed
|
DPW Transportation
|
Pearl / George intersection improvement
|
|
Completed
|
DPW Transportation
|
Willard St Shared Lane Markings
|
|
Completed
|
DPW Water Resources
|
BHS and North Beach - Water Relining
|
|
Completed
|
DPW Water Resources
|
Bradley St. GW Discharge
|
|
Postponed
|
DPW Water Resources
|
Cliff St Water Main Consolidation
|
|
Completed
|
DPW Water Resources
|
College St Force Main Lining
|
|
Completed
|
DPW Water Resources
|
East Plant Phase 1 Upgrades
|
|
Completed
|
DPW Water Resources
|
Main Plant Upgrade Phase 1
|
|
Postponed
|
DPW Water Resources
|
St Paul Street Water Main Replacement
|
|
Completed
|
DPW Water Resources
|
System 15P
|
|
?????
|
DPW Water Resources
|
University Place - Water Line Consolidation
|
|
Proposed
|
DPW Water Resources
|
Upper N. Beach Pump Station Improvements
|
|
Proposed
|
DPW Water Resources
|
Water Plant Pump Station Improvements
|
|
Completed
|
DPW Water Resources
|
WWTP Upgrades Phase 1
|
|
Completed
|
Parks, Recreation & Waterfront
|
Baird Park BBall Court Resurfacing
|
|
Completed
|
Parks, Recreation & Waterfront
|
Burlington Greenway - Railway Realignment.
|
|
Completed
|
Parks, Recreation & Waterfront
|
Burlington Greenway Rehabilitation - Phase 3b
|
|
Completed
|
Parks, Recreation & Waterfront
|
Burlington Greenway Rehabilitation Phase 3a
|
|
Completed
|
Parks, Recreation & Waterfront
|
Calahan Park Playground Replacement
|
|
Under Construction
|
Parks, Recreation & Waterfront
|
Champlain St. Park Renovations
|
|
Proposed
|
Parks, Recreation & Waterfront
|
Inclusion and Belonging Sculpture
|
|
Under Construction
|
Parks, Recreation & Waterfront
|
Leddy Park Pause Place and BioSwale
|
|
Postponed
|
Parks, Recreation & Waterfront
|
North Beach Campground Pull-Through Sites and Road
|
|
Completed
|
Parks, Recreation & Waterfront
|
North Shore Pause Place
|
|
Approved/In-Design
|
Parks, Recreation & Waterfront
|
Pomeroy Park Tot-Lot Replacement
|
|
Approved/In-Design
|
Parks, Recreation & Waterfront
|
Schifilliti Park Multi-Use Pathway
|
|
Under Construction
|
Private Developer
|
City Place Burlington
|
|
Proposed
|
Private Developer
|
Private Development: 157 South Champlain Street
|
977 North Ave
|
Approved/In Design
|
DPW Water Resources
|
CWSRF Pipe Rehabilitation Project (RF1-187)
|
977 North Ave
|
Approved/In Design
|
DPW Water Resources
|
CWSRF Pipe Rehabilitation Project (RF1-187)
|
977 North Ave
|
Approved/In Design
|
DPW Water Resources
|
CWSRF Pipe Rehabilitation Project (RF1-187)
|
ADAMS CT & EXT
|
Proposed
|
DPW Sidewalks
|
Sidewalk replacement at 25 ADAMS CT & EXT
|
ADAMS ST
|
Completed
|
DPW Paving
|
Adams St Crack Sealing
|
ADAMS ST
|
Proposed
|
DPW Sidewalks
|
Sidewalk replacement at 35 ADAMS ST
|
ADSIT CT
|
Completed
|
DPW Sidewalks
|
Willard - End
|
ADSIT CT
|
Completed
|
DPW Sidewalks
|
Willard - End
|
ALEXIS DRIVE
|
Completed
|
DPW Paving
|
Alexis Dr Crack Sealing
|
ALEXIS DRIVE
|
Completed
|
DPW Water Resources
|
Alexis Drive - Stormwater Treatment Facility
|
ALFRED STREET
|
Completed
|
DPW Paving
|
Alfred St Crack Sealing
|
ALFRED STREET
|
Completed
|
DPW Sidewalks
|
Sidewalk reconstruction project at 200 Shelburne on ALFRED STREET
|
ALFRED STREET
|
Proposed
|
DPW Sidewalks
|
Sidewalk reconstruction project at 210 Shelburne on ALFRED STREET
|
ALGIRD ST
|
Completed
|
DPW Paving
|
Algird
|
ALGIRD ST
|
Completed
|
DPW Paving
|
Algird St Crack Sealing
|
ALLEN ST
|
Proposed
|
DPW Sidewalks
|
|
ALLEN ST
|
Completed
|
DPW Water Resources
|
Allen St - Water Main Relining
|
ALLEN ST
|
Completed
|
DPW Water Resources
|
Allen St Stormwater Infiltration System
|
APPLETREE PT RD
|
Under Construction
|
Burlington Electric Department
|
Appletree Point 13.8kV Conversion
|
APPLETREE PT RD
|
Proposed
|
DPW Sidewalks
|
|
ARCHIBALD ST
|
Completed
|
DPW Paving
|
Archibald St Crack Sealing
|
ARCHIBALD ST
|
Completed
|
DPW Paving
|
Archibald St Paving
|
ARCHIBALD ST
|
Proposed
|
DPW Sidewalks
|
|
ARCHIBALD ST
|
Completed
|
DPW Sidewalks
|
Sidewalk reconstruction project at 248 N Willard on ARCHIBALD ST
|
ARCHIBALD ST
|
Completed
|
DPW Sidewalks
|
Sidewalk Replacement
|
ARCHIBALD ST
|
Completed
|
DPW Sidewalks
|
Sidewalk Replacement
|
ARCHIBALD ST
|
Approved/In-Design
|
DPW Transportation
|
Quick-Build Intersection Improvements Archibald/In
|
ARCHIBALD ST
|
Approved/In-Design
|
DPW Water Resources
|
CWSRF Pipe Rehabilitation Project (RF1-187)
|
ARCHIBALD ST
|
Approved/In-Design
|
DPW Water Resources
|
CWSRF Pipe Rehabilitation Project (RF1-187)
|
AUSTIN DR
|
|
DPW Paving
|
Austin (Home to Red Rocks)
|
AUSTIN DR
|
Completed
|
DPW Paving
|
Austin (Red Rocks to End) Paving
|
AUSTIN DR
|
Completed
|
DPW Sidewalks
|
Sidewalk reconstruction project at 1 Industrial on AUSTIN DR
|
AUSTIN DR
|
Completed
|
DPW Sidewalks
|
Sidewalk reconstruction project at 121-91 AUSTIN DR
|
AUSTIN DR
|
Completed
|
DPW Sidewalks
|
Sidewalk reconstruction project at 181-165 AUSTIN DR
|
AUSTIN DR
|
Completed
|
DPW Sidewalks
|
Sidewalk reconstruction project at 197 AUSTIN DR
|
AUSTIN DR
|
Completed
|
DPW Sidewalks
|
Sidewalk reconstruction project at 219 AUSTIN DR
|
AUSTIN DR
|
Completed
|
DPW Sidewalks
|
Sidewalk reconstruction project at 243 AUSTIN DR
|
AUSTIN DR
|
Completed
|
DPW Sidewalks
|
Sidewalk reconstruction project at 309 AUSTIN DR
|
AUSTIN DR
|
Completed
|
DPW Sidewalks
|
Sidewalk reconstruction project at 91 AUSTIN DR
|
AUSTIN DR
|
Completed
|
DPW Transportation
|
Austin Dr Bike Lanes
|
AUSTIN DR
|
Completed
|
DPW Water Resources
|
Austin Dr - Water Main Rehabilitation
|
AUSTIN DR
|
Completed
|
DPW Water Resources
|
Cured In Place Pipe Relining FY 19
|
AUSTIN DR
|
Completed
|
DPW Water Resources
|
CWSRF Pipe Rehabilitation Project (RF1-187)
|
AUSTIN DR
|
Completed
|
DPW Water Resources
|
CWSRF Pipe Rehabilitation Project (RF1-187)
|
AUSTIN DR
|
Accepted
|
DPW Water Resources
|
CWSRF Pipe Rehabilitation Project (RF1-187)
|
BANK ST
|
Completed
|
DPW Sidewalks
|
Sidewalk reconstruction project at 100 BANK ST
|
BANK ST
|
Completed
|
DPW Sidewalks
|
Sidewalk Replacement
|
BANK ST
|
Approved/In-Design
|
DPW Water Resources
|
CWSRF Pipe Rehabilitation Project (RF1-187)
|
BANK ST
|
Approved/In-Design
|
DPW Water Resources
|
CWSRF Pipe Rehabilitation Project (RF1-187)
|
BANK ST
|
Canceled
|
Private Developer
|
Burlington Town Center
|
BARLEY RD
|
Completed
|
DPW Paving
|
Barley Rd Crack Sealing
|
BARLEY RD
|
Proposed
|
DPW Sidewalks
|
|
BARRETT ST
|
Completed
|
DPW Sidewalks
|
Sidewalk reconstruction project at 485 BARRETT ST
|
BARRETT ST
|
Completed
|
DPW Sidewalks
|
Sidewalk reconstruction project at 50 BARRETT ST
|
BARRETT ST
|
Approved/In-Design
|
DPW Water Resources
|
CWSRF Pipe Rehabilitation Project (RF1-187)
|
BARRETT ST
|
Approved/In-Design
|
DPW Water Resources
|
CWSRF Pipe Rehabilitation Project (RF1-187)
|
BARRETT ST
|
Approved/In-Design
|
DPW Water Resources
|
CWSRF Pipe Rehabilitation Project (RF1-187)
|
BARRETT ST
|
Approved/In-Design
|
DPW Water Resources
|
CWSRF Pipe Rehabilitation Project (RF1-187)
|
BATCHEDLER ST
|
Completed
|
DPW Water Resources
|
Batchelder St - Water Main Replacement
|
BATCHEDLER ST
|
Completed
|
DPW Water Resources
|
Batchelder Street - Sewer Rehabilitation
|
BATTERY ST
|
Approved/In-Design
|
Burlington Electric Department
|
Battery & Pearl Switchgear Replacement
|
BATTERY ST
|
Completed
|
DPW Paving
|
Battery St Crack Sealing
|
BATTERY ST
|
Proposed
|
DPW Sidewalks
|
|
BATTERY ST
|
Completed
|
DPW Traffic
|
Battery & Maple Pedestrian Signals
|
BATTERY ST
|
Completed
|
DPW Water Resources
|
Battery Street - Combined Sewer Rehabilitation
|
BATTERY ST
|
Approved/In-Design
|
DPW Water Resources
|
CWSRF Pipe Rehabilitation Project (RF1-187)
|
BAYVIEW ST
|
Completed
|
DPW Sidewalks
|
|
BAYVIEW ST
|
Completed
|
DPW Sidewalks
|
|
BEACHCREST DR
|
Proposed
|
DPW Sidewalks
|
Sidewalk reconstruction project at 231 Lakewood on BEACHCREST DR
|
BEACHCREST DR
|
Completed
|
DPW Water Resources
|
CWSRF Pipe Rehabilitation Project (RF1-187)
|
BEACHCREST DR
|
Approved/In Design
|
DPW Water Resources
|
CWSRF Pipe Rehabilitation Project (RF1-187)
|
BEACHCREST DR
|
Completed
|
DPW Water Resources
|
CWSRF Pipe Rehabilitation Project (RF1-187)
|
BEECH ST
|
Completed
|
DPW Paving
|
Beech St Crack Sealing
|
BELTLINE - 127
|
Under Construction
|
Burlington Electric Department
|
1L4 Long Spans
|
BELTLINE - 127
|
Completed
|
DPW Paving
|
Beltline 127 Crack Sealing
|
BELTLINE - 127
|
Completed
|
DPW Paving
|
Beltline Paving
|
BELTLINE - 127
|
Completed
|
DPW Paving
|
Beltline Ramps North Ave
|
BELTLINE - 127
|
Approved/In Design
|
DPW Water Resources
|
CWSRF Pipe Rehabilitation Project (RF1-187)
|
BELTLINE - 127
|
Under Construction
|
DPW Water Resources
|
CWSRF Pipe Rehabilitation Project (RF1-187)
|
BELTLINE - 127
|
Approved/In Design
|
DPW Water Resources
|
CWSRF Pipe Rehabilitation Project (RF1-187)
|
BELTLINE - 127
|
Approved/In Design
|
DPW Water Resources
|
CWSRF Pipe Rehabilitation Project (RF1-187)
|
BELTLINE - 127
|
Completed
|
DPW Water Resources
|
Rt. 127 Stormwater Outfall Repair
|